Operations | Process | Resources | Strategy

View all articles SUBSCRIBE TO NEWSLETTER to get articles and more

STAY CONNECTED AND SIGNUP TO RECEIVE INSIGHT updates

Subscribe

Asset Constraint Management Capabilities

David Hodes

In my article Competing by Managing Asset Bottlenecks, I unpacked our value statement: ‘We help ambitious executives in industrial environments systemically improve production’. This article looks at four levers that fulfil this promise to make Asset Constraint Management yield its full potential. First, let’s see why it’s so essential to get the most from your assets.

[Listen to audio version, read by David Hodes]

This is Part 1 of our series on Asset constraint management: Part 1 | Part 2 | Part 3 | Part 4 | Part 5

As a species, we are generally more anxious about loss than we are moved by imagining the rewards of the pursuit of gain. Fear of failure often motivates more than the pursuit of a distant goal and will, therefore, likely trump whatever instincts there are to strive for success. We will often play not to lose rather than play to win. When the chips are down and the organisation is not performing well, the usual reaction is to shut down reason and revert to the fight or flight centres of the brain—what Daniel Kahneman called System 1 thinking in his book Thinking, Fast and Slow.

In a scenario where the competition squeezes you on price, or an increase in the cost of labour and material inputs eat into your margins—and sometimes both—the gut instinct is to cut costs. In the heat of battle, this cost-cutting is often done without much in the way of a business case validation. It will almost certainly not entail thinking through a detailed plan on how to bring the assets back to high-reliability once the crisis is over. The context within which we make these reactive decisions is often one of high anxiety and usually serves the needs of senior executives—several levels of abstraction away from operations—seeking to mollify analysts, boards and shareholders.

How many asset managers would be courageous enough to declare that the executive’s short-term gain comes at a high long-term cost to the business? In the world of asset management, you can increase the interval between major maintenance events and save significant amounts of today’s cash outlay, despite the asset being on a slide from tip-top form. The executive gets an immediate win by saving costs and then, unjustly, targets operations down the track after unplanned breakdowns lead to production losses. The asset management team cops a hit and is forced to pay nine stitches for the one not completed on time. And, inevitably, the planned maintenance work has to be done anyway. Not only have you lost production through unplanned outages, but all you have done in terms of saving the cost of the major maintenance event is kicked the can down the road.

“Fear of failure often motivates more than the pursuit of a distant goal”

There is a further effect of this rush to cut costs. In most cases, the people charged with analysing where and how to cut costs are pulled away from the regular rhythms and routines of running their part of the business. You add workload to an already busy schedule as you redo budgets, compute the forecasts and keep going back to get to a number to appease the powers that be. There is little heed paid to the load put on these analysts and the resultant stress that arises. They know they are mortgaging the future of staff engagement and equipment performance in pursuit of solutions which will likely result in only a short-term fix to a current cost problem. It diminishes pride in work and builds a culture of cynical compliance. Although the easy way out usually leads back in, we are seldom bold enough to call a halt to the madness.

What is the way out of this bind? What can we do to sustainably break the cycle of kneejerk responses to the inevitable ups and downs of the market? It is not enough to issue pleas to the workforce to freeze recruitment or make contributions via the suggestion box to cost-saving ideas. The systems thinker looks for leverage, and the leverage lies in a systemic approach to improvement of production, as first outlined in last week’s article.

There are four major areas where we can increase production without compromising safety or increasing costs:

1. The planning and execution of projects
2. Production maximisation
3. Maintenance management
4. Contractor controls

The good news is that the Theory of Constraints (TOC) was invented to address the planning and performance of work in a consistent manner, with a single organising principle, across all of these areas of focus. Let’s take a brief look at each in their turn:

The planning and execution of projects

A forestry manager had a well-drilled team of axemen able to cut more cords per hour than any other. They had learned all the lessons of highly effective people such as ‘sharpen the saw, begin with the end in mind etc.’ When they got to the end of the project, they did a great job, very efficiently, but cut down the wrong forest.

Portfolio selection is the art of making the right decisions as to which projects you do, in what sequence, and when, based on the finite resources available to get them done. Understanding your project’s ‘octane’, or NPV per unit of your scarce resource, makes all the difference to optimising your flow of cash. Furthermore, an analysis of this sort will provide you with an accurate measure of where the focused investment of specific additional resources can yield a disproportionate outcome for the overall portfolio.

Critical Chain Project Management (CCPM) is the only method of project planning and execution which has explicit and proven means of addressing the twin challenges of being restricted to a finite resource pool and operating in environments of intrinsic uncertainty. The method includes the ability to systematically program and pipeline the execution of multiple projects based on the system’s bottleneck and hence yield an optimum result for increased volumes and reduced operating expense.

You maximise production potential by first choosing the right projects in the portfolio. Executing projects flawlessly is how you turn portfolio possibility into business reality. Having capability in the TOC project planning and execution capabilities is a path to both doing the right things, then doing them right.

Production maximisation

Increasing volume through an existing asset base has two benefits. The obvious first one is the contribution made by the extra output. Every extra unit produced without any increase in fixed costs adds the whole of the increased throughput (marginal contribution) direct to the bottom line. Likewise, the increased output dilutes the fixed costs of the business. Thus the unit cost of production is reduced—an important measure when trying to get into the lowest quartile of the cost curve.

The TOC way to safely and reliably increase production is Drum Buffer Rope (DBR) What’s remarkable about DBR is its wide variety of applications. Once the concept is understood, you can apply it across an array of asset management fields such as synchronising maintenance work where complex interactions occur between shared resources and different areas of the plant. Or managing the high number of technical queries hitting the desk of the reliability engineers as operations look to get the most productive use of these scarce custodians of continuous improvement. You could even apply it to processing the qualifications of contractors as they mobilise for a major maintenance event.

Maintenance management

Typically maintenance is made up of four big categories: routine maintenance, emergency work, emergent work (which you don’t need to address immediately) and shuts.

Doing the work of regular maintenance on time, in full, is a production issue and thus lends itself very well to a Drum Buffer Rope approach. It has the same characteristics as most engineering job shops. Shuts, on the other hand, are significant events which have a defined scope, cost and schedule. They are therefore best treated as projects with CCPM—especially its most recent breakthrough innovation: two-tier scheduling.

Using the constraint accounting framework provides asset managers with the means of calculating the cost of an hour gained or lost at the value chain’s bottleneck. In asset management, the gains and losses typically dwarf the associated costs. In the case of routine maintenance, it’s about delivering high levels of schedule adherence on the day; for significant maintenance events, such as shuts or checks, it’s about compressing the length of the critical chain.

Contractor Controls

By contractors, I mean anyone who does work for the organisation who is not a full-time employee. Contractors could include anything from engineering consultants to software specialists and from trade craft to project managers. One of the features of TOC is the ability to articulate both the supply and demand of resources required to achieve the work outcomes. When using its methods of project and production management, the attention to the detail of quantitative work management provides a framework and practical means of effective resource management.

Knowing what kind of resource by skill type is available for any given time and place lets us find the constraint. It also naturally corresponds to the demands of those who are accountable for contractor controls: work management, supply, finance, training, safety, and execution to name a few. Being able to integrate the plethora of information systems involved in accounting for everyone who comes to do work on site creates a real source of competitive advantage.

Schedules of rates, skills matching, timesheeting, qualification verification, rosters, inductions, vendors payments are all brought under one umbrella. We can accurately check the work required on any given day against the people we have to do it and find the magic Goldilocks number. Too many and we’re wasting money—too few, and we’re wasting time. Time is money and money is time.

An added advantage of a seamless approach to end-to-end contractor controls is the massive reduction in overhead burden in processing dozens of different spreadsheets to arrive at an accurate, fair and timely accounting of who owes what to whom for what work.

These four pillars of Asset Constraint Management lead to outcomes that would be thought neither reasonable nor possible without a systems thinking approach.

This is Part 1 of our series on Asset constraints management.
Part 1: Asset Constraints Management Capabilities
Part 2: Projecting Projects
Part 3: Producing production
Part 4: Maintaining production
Part 5: Controlling contractors

____________________________

What’s next?

The change from standard thinking to Theory of Constraints (TOC) is both profound and exhilarating. To make it both fun and memorable, we use a business simulation we call The Right Stuff Workshop.

We’d love to run it with you. To learn more:

  • download the brochure (no email required)
  • schedule a call

    ____________________________

    Night power
    [Background photo: American Public Power Association on Unsplash]

    “Know the whole, focus on the constraint.”

    ____________________________

  • Organisation
  • People
  • Process
  • Strategy
  • Technology

An AI Enabled Mining and Metals Operating Model

David Hodes

The Shortest Path From Mineral Potential to the Highest Sustainable Cash Flow

A mining investment earns its return through the conversion of mineral potential into dependable cash flow. Every uncertainty, delay and misplaced commitment along that journey affects how much capital is required, how long it remains exposed and what the investment ultimately delivers.

For those who allocate capital, the challenge extends beyond identifying an attractive resource. The acquisition thesis depends on connected decisions across geology, studies, approvals, construction, commissioning, production and closure. Each decision can strengthen the investment case or quietly erode it.

An AI enabled Mining and Metals Operating System connects evidence, reasoning, accountability and execution across that journey. Systems Thinking provides the whole asset perspective. The Theory of Constraints directs attention towards the factor governing value today. AI helps people interpret information, examine alternatives and coordinate the work required to change the outcome.

“Where is the greatest gap between the value this asset could credibly create and the value it is currently on course to deliver?”

The operating model below brings these ideas together: human accountability above, the life of mine across the centre, and integrated knowledge and reasoning supporting every stage.


AI enabled mining and metals operating model: Requisite Organisation and human accountability across seven life-of-mine stages, supported by integrated knowledge and reasoning.
An integrated operating model across the life of mine, connecting human accountability, technical work and AI supported reasoning. Click the diagram to enlarge.

Requisite Organisation: put accountability where the work sits

An operating system needs a clear management accountability hierarchy. Purpose and levels of work define the decisions people must make, the authority they require and the capability needed to carry their responsibilities.

A supervisor protecting today’s production, a project director preparing commissioning and a board allocating development capital face different levels of complexity and different time horizons. Each needs information appropriate to the work, clear decision rights and a reliable route for escalation.

AI makes this clarity more important. Recommendations must have accountable human owners, particularly where commitments cross the boundaries between investors, asset owners, contractors and service providers.

For investors, this provides a practical test of execution capability: can the organisation show who owns each assumption in the investment thesis, who can authorise action and how unresolved issues reach the right decision maker?

Exploration and Resource Definition: reduce the uncertainty that matters

Exploration creates value when it resolves uncertainty that changes a worthwhile decision. More data becomes useful when it improves confidence about what is present, where it lies and what further work is justified.

AI can help connect geological reports, assay results, drilling records, geophysical observations and three dimensional interpretations. Shared terminology and traceable relationships allow teams to compare evidence, expose inconsistencies and distinguish observations from interpretations.

The investor’s question is which uncertainty governs the next commitment. A targeted investigation may change the development route, support further drilling or reveal that the opportunity cannot yet justify additional capital.

New sensing and interpretation methods must earn confidence through appropriate validation. The objective is a better sequence of learning and commitment, with uncertainty visible throughout.

Studies and Project Definition: shape options before locking in capital

Studies turn a resource opportunity into choices about mine planning, processing routes, infrastructure, scale and development sequence. Those choices establish much of the future cost, risk and operating flexibility of the asset.

An integrated operating system connects technical narratives, economic models, engineering constraints and spatial representations. Teams can examine whether assumptions agree across disciplines and whether the preferred option remains attractive under plausible changes in conditions.

Approvals, water, power, logistics and workforce requirements belong in this comparison from the outset. Internal experience and relevant external benchmarks can challenge optimistic estimates.

For investors, the benefit is a clearer explanation of why an option deserves funding, what could defeat it and which evidence should be obtained before the next irreversible commitment.

“The most valuable early action may be the one that changes the next capital decision.”

Projects and Capex Delivery: keep the investment case alive

Once capital is committed, the central question becomes whether the project remains on course to deliver its business case. Progress percentages alone cannot answer it.

Engineering maturity, procurement, construction sequencing, approvals and commissioning readiness must be considered together. Individually manageable deviations can combine into a material threat to first production and cash flow.

AI supported delivery intelligence can connect schedules, costs, risks and physical evidence, helping teams identify contradictions and emerging dependencies between formal review gates.

Management can then assess intervention options while choices remain available. A useful assurance process explains what changed, why it matters, who must act and when. Success appears in improved delivery confidence, controlled capital exposure and a credible route into operation.

Mining and Processing: manage the constraint governing saleable output

The economic performance of a mine depends on how extraction, material movement and processing work together. Improving one activity can consume capital without improving the whole.

If processing capacity governs saleable output, increasing mining volumes may simply build stockpiles and working capital. If feed variability constrains recovery, additional plant availability may deliver less benefit than expected.

Connecting mine plans, ore characteristics, plant conditions and production results helps teams investigate these relationships. AI can support the comparison of operating choices, while physical models and simulation help test their consequences.

The discipline is to find the constraint, optimise for it, collaborate around it, uplift it and start again. The measure is the resulting contribution to cash generation, with safety, quality and environmental obligations respected.

Operations and Maintenance: protect the flow of value

Maintenance creates value through its effect on the productive capability of the system. Equipment critical to the governing constraint deserves particular attention because its failure can interrupt the entire flow of output.

An integrated operating system connects procedures, equipment histories, sensor readings, work orders, spare parts and operating conditions. Consistent asset identities and failure classifications help teams interpret information across systems.

AI can support prioritisation and flag emerging patterns for investigation. Simulation can also help operators and maintainers rehearse commissioning, abnormal conditions and recovery from disruption.

For investors, the question is whether this changes reliability and economics: more dependable throughput, better recovery, fewer damaging interruptions and a sustainable balance between production demands and asset capability.

Tailings Dam Remediation: connect obligations with operating decisions

Tailings facilities connect engineering performance, environmental responsibility, operational continuity and long term liability. Their condition and management belong within the investment case.

Inspection reports, monitoring data, risk thresholds, drawings and terrain models can be brought into a shared context. AI can help identify inconsistent records, surface changes requiring attention and connect actions with accountable owners.

Qualified professionals must interpret the evidence and authorise decisions. Traceability matters: the organisation should be able to show what was observed, how it was assessed and what followed.

Where reprocessing or resource recovery is contemplated, the opportunity requires its own technical and economic evidence. Potential value must be considered alongside remediation obligations, additional capital and the consequences of disturbing existing facilities.

Decommissioning and Closure: design the legacy into the economics

Closure decisions begin long before production ends. Land disturbance, infrastructure choices, water management and waste handling can create obligations that persist beyond an investor’s ownership period.

Connecting closure plans with operating and capital decisions helps reveal those consequences earlier. Progressive rehabilitation can be evaluated alongside production needs, while evolving assumptions remain visible in forecasts and decision records.

AI can support the organisation of obligations, evidence and dependencies across the asset’s life. Credible cost estimates and technical judgments remain essential.

For investors, better closure visibility informs valuation, capital planning and exit readiness. A future buyer needs confidence that liabilities are understood, supported by evidence and reflected in the economics.

Integrated Knowledge and Reasoning: connect evidence with action

Supporting every stage is the ability to reason across verbal, numeric, logical and spatial information. Reports explain intent; models quantify consequences; rules establish conditions; drawings and three dimensional models reveal physical relationships.

These sources need shared meaning, or semantics, and explicit relationships, or ontology, within the organisation and across customers and service providers. Otherwise, apparently connected systems can continue to describe different realities.

For example, “ready for commissioning” should connect to agreed requirements for construction completion, inspection, training and operational acceptance.

AI agents can help trace dependencies, identify conflicting assumptions and prepare options. The operating system then connects decisions to owners, scheduled work and completion evidence. Learning from the result updates the next decision.

“Enterprise value is the product. Capabilities are the machinery.”


What’s next?

Begin with one material value problem. Establish the economic baseline and current trajectory. Identify the governing constraint, material uncertainties and credible intervention options. Agree accountable owners, decision gates and a practical action pathway.

Measure the result through time to cash, throughput, recovery, capital exposure, operating cost and liability. Translate changes into the investment model, including implementation costs and avoiding double counting.

An AI enabled Mining and Metals Operating System earns its place when it helps change the asset’s economic trajectory. For investors, the opportunity is a repeatable capability for converting mineral potential into realised value.

READ MORE

  • MedTech

Validating medical device concepts before major investment

David Hodes

Concept validation

A concept can look convincing in a presentation and still make an important task harder. A patient may misunderstand an indicator. A clinician may need information the design does not provide. A promising workflow may depend on support unavailable in the intended setting.

These problems become more expensive when the organization discovers them after committing to architecture, tooling or a launch plan.

We must ask how effectively concepts are validated before significant resources are committed. Patient Centered Design treats this as a learning discipline: turn ideas into testable solutions rapidly using low fidelity prototyping, put them in front of relevant users and gather evidence about whether they improve the outcomes that matter.

“A convincing presentation shows what the team hopes will happen. A useful test reveals what people actually do.”

Begin with a question that can change the decision

A prototype without a learning objective can generate interesting comments while leaving the key decision unresolved. Start by identifying what must be true for the concept to succeed.

Does the patient intuitively understand the required action without explanation? Can the professional recognize when the result is ready to use? Does the proposed approach fit the work surrounding the task? Will people take meaningful steps toward adoption?

State the assumption and the evidence needed to assess it. Agree what would support proceeding, what would require revision and what could make the concept unviable. Gather quantitative data along with qualitative verbal feedback.

Prioritize questions with substantial consequences for the investment. An attractive enclosure deserves less attention than an unresolved issue that could prevent safe or practical use of the whole solution.

Choose the simplest useful representation

A picture is worth a thousand words. A simple user experience prototype is worth a thousand pictures. Choose artifacts that maximize learning with the least effort. The appropriate artifact depends on what the team needs to discover.

A sketch may help users explain how they interpret a proposed interaction. A physical mock-up may expose handling difficulties. A simulated interface can support a sequence of tasks. A more complete prototype may be necessary to examine timing, feedback or combined interactions.

Build enough realism to test the assumption accurately. Excessive detail can consume resources without improving the evidence, while insufficient fidelity can conceal the issue being investigated.

Make limitations clear to participants and observers. A manually simulated function may help test an experience, but it does not establish that the technology can deliver that function reliably.

Recruit people who represent the intended use

Patients and healthcare professionals can differ in experience, confidence, physical ability, responsibilities, and access to support. Those differences influence whether the concept helps them complete the job.

Define the participants and contexts relevant to the test. Include people whose circumstances could expose difficulties the development team has overlooked.

A familiar expert may work around a confusing interface that challenges a new user. A clinician from a highly supported center may assume resources unavailable elsewhere. Research needs to reveal these dependencies.

Match the study to its purpose. Exploratory sessions can identify problems and guide iteration. They do not automatically establish population-wide performance or replace the evidence required for later design validation.

Create an Experience Café around real tasks

An Experience Café gives participants a structured opportunity to encounter concepts and talk about their experience. Its value comes from the quality of the scenario, observation and follow-up questions.

Set up situations that reflect what the person is trying to accomplish. Let participants interact with the artifact rather than rely solely on a demonstration by its designer. Build rough and rapid.

Assign roles to facilitators and observers. Agree how comments, actions and difficulties will be captured. Keep the session focused on learning rather than defending the proposed solution. Hold a conversation around the prototype. “Can you show me how you would use this?” “Tell me what you are thinking here.”

Ask participants to explain what they believe is happening and what they would do next. Observe where the concept supports that understanding and where they hesitate, improvise or seek help.

Listen without teaching away the problem

A facilitator can unintentionally make a weak concept appear successful by explaining each step or supplying missing information.

Use neutral prompts and allow participants to reveal their interpretation. When assistance is necessary, record it along with the point at which the person became stuck.

Follow observations with questions about purpose and reasoning. What did the participant expect? Which information did they look for? Why did they choose that action?

Separate a preference from evidence about task performance. “I like this one” may reflect appearance or familiarity. Successful completion, appropriate interpretation and manageable effort provide a stronger basis for assessing whether the concept addresses the need.

“Every explanation the facilitator must supply is a question about what the design expects the user to know.”

Examine the complete experience

The product interaction belongs within a wider job. Test preparation, readiness, execution, monitoring and what follows, wherever these activities affect the concept’s value.

A device may work well once configured while setup introduces avoidable complexity. A result may be easy to view while the professional still needs to transfer it manually before acting.

Include relevant dependencies on caregivers, staff, information and other systems. Investigate whether the concept reduces burden for one participant by increasing it for another.

Use realistic scenarios appropriate to the development stage. Important exceptions and recovery steps deserve attention alongside routine success. An incomplete or interrupted task can reveal weaknesses that a carefully guided demonstration leaves hidden.

Make cognitive burden visible

Ease of use involves what a person must notice, understand, remember, decide and physically do. A tidy interface can still demand substantial mental effort.

Human performance depends on limited attention, working memory and feedback. Examine how the concept supports those processes during a task.

Does it make the relevant information perceptible? Can the user understand its meaning? Is the next action clear? Can they recognize whether that action succeeded?

Look for unnecessary steps, demands to remember information across screens and alerts that interrupt without helping a decision. The best change may simplify a sequence or improve feedback rather than add another feature. Confirm its effect through observation and appropriate measures.

Measure effort alongside task success

Choose measures that reflect the priority outcome and the study’s purpose. These may include completion time, errors, requests for help, repeated actions or failure to notice important information.

Subjective workload measures can complement observed performance. NASA Task Load Index can help structure participants’ assessment of workload, while PURE provides an expert assessment of the effort required to complete tasks. Satisfaction ratings on a Likert scale can be used to compare concepts directly with each other and a baseline solution.

Do not treat one measure as a complete account of usability. Faster completion may accompany misunderstanding. A participant may complete the task correctly while reporting effort that makes repeated use impractical.

Interpret results together and examine the conditions under which they occurred. Record the limitations so decision makers understand what the test has established.

Test demand separately from technical feasibility

Pretotyping examines whether people take meaningful action toward using or adopting an idea before the full solution exists. It addresses a different question from whether a working product can be engineered.

A clearly described concept, service simulation or expression-of-interest process may provide evidence about engagement. The strength of that evidence depends on the action required and the conditions surrounding it.

A click demonstrates less commitment than a substantive implementation conversation. Neither establishes clinical efficacy or successful device use.

For medical concepts, keep representations accurate and make the test status clear. Interpret behavioral evidence alongside clinical appropriateness, access requirements and the responsibilities of the people making adoption decisions. Interest alone cannot establish that the solution should proceed unchanged, particularly when workflows in the clinical setting are involved.

Refine the value proposition with evidence

A value proposition explains which customer the concept serves, the job it supports and the difficulties it intends to reduce. It should connect directly with the outcomes identified through research.

Compare that proposition with the evidence from concept tests. Did participants experience the intended benefit? Did another difficulty become more important? Did the concept require assumptions that the intended setting cannot support? Did the concept do something better than a competitor’s current solution?

Capture both positive and negative findings. Use them to revise the concept, the proposition or the team’s understanding of the need.

Then test the important changes. Iteration should answer a question left open by the previous round. Repeating sessions without changing the artifact or research objective can accumulate comments while leaving uncertainty untouched.

Keep early findings within their proper limits

Early concept validation supports decisions about direction and investment. It does not establish all the evidence needed for a finished medical device.

Technical performance, reliability, clinical benefit and intended-use safety require appropriate subsequent work. A convincing simulated experience may depend on functions the team has not yet demonstrated.

Make these boundaries visible in the decision record. State who participated, what was tested, the conditions, findings and unresolved issues. Explain how those findings affect the next commitment.

Overall, having a “winning concept” in hand, backed by user Experience Café data along with user needs in the form of outcome statements formally structured with a direction of improvement and unit of measure, sets a development team up for success. The outcome statement user needs provide a solid foundation for the design history file.

Rapid prototype experience testing gives the team answers to key decisions and sets a target to pursue early on. This results in faster development cycles, more robust regulatory submissions, and better returns on investment spending.

A Value Management Office can connect this learning with resources and stage decisions. Testing should help the organization commit at a pace justified by evidence and concentrate effort on the uncertainties that govern progress.

“Early validation creates value when it changes the concept or the commitment before an unresolved assumption becomes expensive.”


What comes next

Examine one proposed investment. Which assumption could defeat the concept, and what is the least costly credible way to test it?

Prepare an appropriate artifact, involve representative users and observe meaningful tasks. Review the evidence, revise the concept and record the next learning decision. This gives Patient Centered Design a practical route toward solutions people can successfully use and organizations can responsibly develop.

READ MORE

More than just work

Discover better ways to do better work.

Fresh insights, every Friday

We alternate our own actionable articles with three relevant links from other authorities.

We’ll only use your email address for this newsletter. No sales calls

    Subscribe to 'Perspectives'

    [recaptcha id:cf7note]

    More Than Just Work
    Weekly productivity insights

    Subscribe
    • EnsembleConsultingGroup
    • Share Page
    • +61 2 9387 3955
    • info@EnsembleConsultingGroup.com

    Site proudly designed by Brand Fibre

    What is to get in touch with you?



    More than just work

    Discover better ways to do better work.

    Fresh insights, every Friday

    We alternate our own actionable articles with three relevant links from other authorities.


    We’ll only use your email address for this newsletter. No sales calls

    white_arrow white_bidirection_arrow arrow-right-green arrow-right-orange arrow-right arrow-left blue_arrow blue_round_arrow tick

    Want us to get in touch with you?

     
    Thank you for your interest. We will call you back.